Alloy Lines

  • After Logging on to the system, click on the “Data Cleaning” Link  from the Quick Links Menu.
  • A “Data Cleaning ” window will be opened with a menu displayed within the Left panel of the window.
  • The displayed menu is divided into 3 categories:
  • Data Entry containing items:  “Line/Tanks”, “sheets”, “joints”, “Welders”, “Alloy Line/Tanks” and “Delete Line/Tanks/joints”.
  • NDE Reports containing items: “VT”, “RT”, “MT”, “PT”, “UT” and “Other Report”
  • RT Rejection containing items: “Edit RT Rejected” and “Edit Rejection Welders”.
  • Clicking Item “PT Report” within Data Cleaning menu7 , a dropdown list containing all areas within the system is displayed.
  • Selecting Area from Areas dropdown list, all Line/Tanks within selected Area are displayed in a grid view. Each Line/Tank with “Alloy” icon, along with “Alloy” button. 8
  • “Alloy” icon for any Alloy Line/Tank within selected Project/Area are displayed as1  and for the other as 2.
  • Check all the Line/Tanks you to be Alloy and then click “Alloy” button.
  • All checked Line/Tanks are Alloy Line/Tanks.
Tagged with: , ,
Posted in Data Cleaning, Welding Manager Training