Blog Archives

Adding Joints to VT Report

Log in to the system. From the Upper bar in Home Page, Click on “Workflow” Link  which will open a form containing a summarized Workflow of the system. Click on the “VT” button. You will be redirected to “VT Report”

Tagged with: ,
Posted in Joints, Operation Section, Welding Manager Training

Rejecting VT Report

Log in to the system. From the Upper bar in Home Page, Click on “Workflow” Link  which will open a form containing a summarized Workflow of the system. Click on the “VT” button. You will be redirected to “VT Report”

Tagged with: ,
Posted in Operation Section, Welding Manager Training

VT – Visual Inspection

Adding VT Report To add a VT Test you must have at least one welded joint. You can display “Add VT” main window via “Work Flow” link within the upper bar in Home Page or via “Add VT” link within

Tagged with:
Posted in Joints, Operation Section, Welding Manager Training

Operation Section

Weld Joint You can display “Weld Joint” main window via “Work Flow” link within the upper bar in Home Page or via “Weld Joint” link within Quick Links. Log in to the system. From the Upper bar in Home Page,

Tagged with: ,
Posted in Joints, Operation Section, Welding Manager Training