Blog Archives

Delete Lines/Tanks/ Joints

After Logging on to the system, click on the “Data Cleaning” Link  from the Quick Links Menu. A “Data Cleaning ” window will be opened with a menu displayed within the Left panel of the window. The displayed menu is

Tagged with: ,
Posted in Data Cleaning, Joints, Tanks, Welding Manager Training

Reassign Lines/Tanks

After Logging on to the system, click on the “Data Cleaning” Link  from the Quick Links Menu. A “Data Cleaning ” window will be opened with a menu displayed within the Left panel of the window. The displayed menu is

Tagged with:
Posted in Data Cleaning, Tanks, Welding Manager Training

Editing Line/Tank Details

After Logging on to the system, click on the “Area / Project” Link  from the Quick Links Menu. An “Area / Project” window will be opened, with all the Projects (Areas) within the system displayed within a grid view. For

Tagged with: ,
Posted in Lines, Tanks, Welding Manager Training

Adding and Modifying Lines/Tanks

Lines/Tanks are Part of Projects/Areas; so first you should identify the Project/Area for This Line/Tank, and then you should add the Line/Tank Details as Per the ISO Drawing. Same line /Tank cannot be added twice to the same Project/Area. Line/Tank

Tagged with: ,
Posted in Lines, Tanks, Welding Manager Training